Guestroom

Oh my. This paneling was four feet high and surrounded the entire room. I'm not sure what the material was but it smelled like a hamster cage. Ewwww.


I tore off the paneling, repaired the walls and painted - a 3 week process as each panel was applied with glue and the drywall needed major patching.

I love this room!

I printed black and white photos of family and scenery from our trip out west and placed them in black frames.

I really like the blue/yellow combination - it reminds me of a Bed & Breakfast type of feel. I also painted the desk, headboard and side table a deep chocolate brown.
Living Room

Pictures from the day we closed on the house. The previous owners left the curtains and I can't believe we had them up as long as we did.

The original setup when we moved in...

...another angle.

Same angle as above photo (the color is off because I took pictures in the evening but I couldn't wait to post!)

Notice how the trim is white?? I have now painted all the trim except the banister - that's all the windows, all the baseboards and all the closets doors (front and back) with, ahem, 4 coats each!
Dining Room

There was also paneling in this room (remember the guest room)...

...but, even though on maternity leave, I didn't have the energy to repair the walls. So, I filled the paneling to make the walls flat and then painted (this took 5 coats).

The day we moved in.

White trim, painted walls and a new light fixture. Ahhhhh.
Kitchen

Again, as it was the day we closed. Dining room to the right, living room to the left.

Another view. Note the beautiful, bulky hood over the stove.

Some of you may be disappointed that we covered these authentic, retro floors. Too bad. Out with the old...

...and in with the new! (the hood is gone!!)

And yes, it took 4-5 coats of paint to cover the cabinets (which is why they are painted only on the exterior)
Upstairs Bath

Wow. Now this was really in rough shape. Carpet in a bathroom can be difficult to maintain and it always felt "wet" in here. This was actually the first room that I remodeled, completing it in about 1 week in August, 2006.

Note the "Aztec" wallpaper border. It was along the ceiling too. The counter was black with gold marbling and there were 3 mirrors in here (above the sink, behind the door and on the door).

I installed self-locking laminate wood floors, a new toilet and a counter-height hickory vanity so I don't have to bend over to brush my teeth!

This is an older picture because now the door is white but you get the idea.
Our next plans include placing a light above the stove (and eventually replacing the entire kitchen in our dreams) and then tackling the basement. Our room has taken minimal updating - paint on the walls and, of course, painting the trim, but it won't see more until we can change the carpeting. Basement plans include drywall, ceiling, flooring and bathroom.
Well, it is Saturday night, Mike is up north with his dad to put away boats for the summer and I am home with Bennett. We shared a spaghetti dinner and made a quick trip to Blockbuster. Unfortunately, B has fallen asleep so I will be enjoying my movies now without him. Goodnight all.








































